The City Engineer shall review subdivision proposals and other proposed developments to assure that:
(a) All such proposals are consistent with the need to minimize flood damage;
(b) All public utilities and facilities such as sewer, gas, electrical and water systems are located, elevated and constructed to minimize or eliminate flood damage; and
(c) Adequate drainage is provided so as to reduce exposure to flood hazards.
(Res. 1174. Passed 3-6-75.)