§ 112.47  BLOWOUT PREVENTER; OTHER CONTROL EQUIPMENT.
   A blowout preventer, control head, and other connections for keeping the oil or gas well under control at all times shall be installed as soon as surface casing is set. The blowout preventer shall be tested against pump pressure at least once every 24 hours.
(‘68 Code, § 23-45) (Ord. 1112, passed 1-18-65)  Penalty, see § 10.99