1428.07 PERMIT REQUIRED.
   A permit is required for the construction, installation, extension or alteration of a boiler, whether it is subject to or exempt from the Boiler and Pressure Vessel Safety Act and Rules and Regulations, or the appurtenant water or steam distribution lines of a boiler.
(1977 Code § 6-504; Ord. 89-12. Passed 4-17-89.)