1024.20 CONTINUING MAINTENANCE BY THE PERMITTEE; DEFECTIVE BACKFILLING.
   (a)   For a period of three years from the completion of any excavation, it shall be maintained by the permittee. Such maintenance shall include the immediate repair of any defects appearing in the surface, the maintenance of the grade at the level required and additional backfilling and resurfacing when necessary in the opinion of the Public Works Director.
   (b)   Any settlement of the surface within the three-year period shall be deemed conclusive evidence of defective backfilling by the permittee,
(1977 Code § 24-125; Ord. 94-80. Passed 9-19-94.)