§ 1-10-36. INSPECTION FREQUENCY AND REPORTS.
   (A)   The owner/developer shall maintain a copy of the approved erosion and sediment control plan on site.
   (B)   Every active site having a designed erosion and sediment control plan should be inspected for compliance with the plan on average once every 2 weeks.
   (C)   A written report shall be prepared by the inspection/enforcement authority after every inspection. The report shall describe:
      (1)   The date and location of the site inspection;
      (2)   Whether the approved plan has been properly implemented and maintained;
      (3)   Practice deficiencies or erosion and sediment control plan deficiencies;
      (4)   If a violation exists, the type of enforcement action taken; and
      (5)   If applicable, a description of any modifications to the plan.
   (D)    The inspection/enforcement authority shall notify the on-site personnel or the owner/developer in writing when violations are observed, describing:
      (1)   The nature of the violation;
      (2)   The required corrective action; and
      (3)   The time period in which to have the violation corrected.
(Ord. 12-27-622, 11-8-2012; Ord. 14-23-678, 11-13-2014)