(A) The owner/developer shall maintain a copy of the approved erosion and sediment control plan on site.
(B) Every active site having a designed erosion and sediment control plan should be inspected for compliance with the plan on average once every 2 weeks.
(C) A written report shall be prepared by the inspection/enforcement authority after every inspection. The report shall describe:
(1) The date and location of the site inspection;
(2) Whether the approved plan has been properly implemented and maintained;
(3) Practice deficiencies or erosion and sediment control plan deficiencies;
(4) If a violation exists, the type of enforcement action taken; and
(5) If applicable, a description of any modifications to the plan.
(D) The inspection/enforcement authority shall notify the on-site personnel or the owner/developer in writing when violations are observed, describing:
(1) The nature of the violation;
(2) The required corrective action; and
(3) The time period in which to have the violation corrected.
(Ord. 12-27-622, 11-8-2012; Ord. 14-23-678, 11-13-2014)