§ 1-7-63. TEMPORARY INSTALLATIONS.
   A temporary permit shall be required in connection with electrical equipment installed for a temporary use for a period not to exceed 6 months. Such permit may be extended for an additional period of 6 months by the Department.
(Ord. 76-6-66, § I, 4-5-1976; Ord. 14-23-678, 11-13-2014)