§ 52.021 DESIGN.
   (A)   Submissions to the village. The owner who desires to construct a new water main or a water system extension must submit the following to the village:
      (1)   Three sets of prints, plans and specifications;
      (2)   Cattaraugus County Department of Health Application for Approval of Water Distribution System partially completed with information specific to the water system extension. The Superintendent will supply related village information on the form, will sign this application and will forward it to the Cattaraugus County Health Department.
   (B)   Standards. Drawings to scale bearing the stamp of a New York licensed engineer are required. Such plans and specifications shall include without limitation the location, size, nature and specifications of all physical components of the system (e.g. water lines, valves and associated equipment) the location and construction of all access roads, the location of any easements or other property rights to be provided to the village, a surveyor's description of the property rights required for the operation, maintenance and repair and replacement of the water system extension and such other information as is deemed necessary by the village or its engineers. Design of the system must include, without limitation, adequate means of ingress and egress to the entire system for its operation, maintenance, repair and replacement. Where deemed necessary by the village, provision must be made for roads of sufficient hardness to support vehicular traffic.
   (C)   Review. The village and its engineers will review the materials submitted. The owner must provide information and general cooperation with the village as is necessary to effectuate the review.
   (D)   Approval. The village will either approve the owner's plans and specifications, reject them in whole, or return them with comments for needed modifications. The owner's engineer shall consult closely with the village's staff during the review by the village and the Cattaraugus County Department of Health. After the approval of the plans and specifications by the Cattaraugus County Health Department and the village and the proof of liability insurance required by this subchapter are filed with the village, construction may begin.
(Ord. 2-2009, passed 3-23-2009) Penalty see § 52.999