(A) All street openings shall be backfilled immediately after the completion of the applicant’s work therein. If material under the roadway is unsuitable, contaminated or saturated, it shall be removed from the site and suitable granular material shall be brought in.
(B) Excavations shall be properly backfilled and compacted with mechanical vibratory compactor in horizontal layers not to exceed 12 inches in thickness. The opening and the adjoining pavement which may have been disturbed in the progress thereof shall then be temporarily paved and the temporary pavement gird for by the applicant until such time as the village shall decide and notify the applicant, by ordinary mail, that proper settlement of the backfill has taken place, whereupon and within ten days of the notice the applicant shall permanently repave the opening and adjacent pavement disturbed by him or her with at least the same quality of material and grade of workmanship as the original pavement and, upon so doing to the satisfaction of the Superintendent of Public Works, shall be entitled to at refund of the deposit made by him or her under § 93.098(A) above.
(C) Upon his or her failure to do so within the time required, the village may refill and repave the same and charge the applicant with the cost hereof at the rates specified in § 93.098(A) above. During the course of all construction, the applicant shall be responsible for all pollution and dust control pertinent to the operation.
(Ord. 4-2006, passed 6-12-2006) Penalty, see § 93.999