(A) All developments shall provide all applicable utilities to each building lot. All utilities shall be underground.
(B) Property owners may choose an alternative power source (solar, wind, hydro, or generator). In such cases, the power source must be engineered to adequately supply the electrical load. Engineering documentation must be provided to the county.
(Ord. 2007-8-13, passed 3-11-2019
; Am. 2-28-2022)