§ 155.167 NEED FOR SPECIFIC STANDARDS.
   If proper landfill standards are not adhered to, the operation may result in an open dump and create a serious health hazard. A completed landfill will settle and will require periodic maintenance. Because of this settlement factor, special design and construction techniques must be utilized for building constructed on a completed landfill. As a result of the factors listed above, sanitary landfills must be placed in an exclusive use zone, which includes specific design standards and appropriate protection for subsequent use.
(Ord. 8, passed 10-23-1987, § 4.603; Ord. 3-2002, passed 5-3-2002)