In addition to, and not in lieu of, all other costs, reimbursable expenses and other fees charged, the applicant for a building permit shall pay, at the time of permit approval, the following fees for construction and inspection for new construction, remodeling, and building additions for various zoning classifications and specified project descriptions as follows:
(A) E-R through R-5 zoned property (residential dwellings).
(1) A fee of $0.40 per square foot of total building area.
(2) In addition, the applicant shall pay the village for all consultant building code review charges incurred during its review of multi-family and single-family dwelling construction.
(B) B-1 through B-5 zoned property (commercial).
(1) A fee of $0.50 per square foot of building area.
(2) In addition, the applicant shall pay the village for all consultant building code review charges incurred during its review of all commercial construction.
(C) I-1 and I-2 zoned property (industrial).
(1) A fee of $0.50 per square foot of building area.
(2) In addition, the applicant shall pay the village for all consultant building code review charges incurred during its review of all industrial construction.
(D) All zoning districts — remodeling.
Value of Permit | Cost of Permit
|
$0 - $100.00 | $0 |
$100.01 - $1,000.00 | $75 |
$1,000.01 - $2,500.00 | $125 |
$2,500.01 - $5,000.00 | $150 |
Over $5,000.00 | $150* |
* plus $15 per $1,000 of valuation |
(E) Remodeling permit fees. Remodeling permit fees shall be set from time to time from by the Board of Trustees.
(F) Plan review fee. In addition to other fees, at the time of the application, the applicant shall pay a plan review fee in an amount based upon the cost of construction as defined below. For the purpose of this section, it shall include, but not be limited to, the following types of construction: commercial, industrial and residential, including new construction, remodeling, and all repair work other than no fee permits. Construction cost shall be as determined by the most current publication of the RS Means Construction Cost Data Book unit costs. Should the construction type not be listed in RS Means Construction Cost Data Book, the value of construction, as noted on the building permit application, may be used at the discretion of the Building Official.
Construction Costs | Review Fee
|
$0 - $2,000.00 | $25 |
$2,000.01 - $10,000.00 | $50 |
$10,000.01 - $25,000.00 | $75 |
$25,000.01 - $100,000.00 | $100 |
Over $100,000.00 | Will be based on 10% of the village building permit fee |
(G) Accessory/repair permit fees.
Type of Permit | Permit | Review | Total |
Type of Permit | Permit | Review | Total |
Air conditioner (hard wire) | $30 | $25 | $55 |
Asphalt/resurface | $10 | $25 | $35 |
Basketball court | No fee | No fee | No fee |
Boiler | $30 | $25 | $55 |
Brick pavers (patio, driveway, service walk) | $30 | $25 | $55 |
Commercial/industrial parking lot sealing | No fee | No fee | No fee |
Concrete patio or driveway, walks (new) | $10 | $25 | $35 |
Concrete stoop, patio or walks repair replacement | $10 | $25 | $35 |
Deck | $45 | $25 | $70 |
Demolition | $45 | $25 | $70 |
Dog run | $20 | $25 | $45 |
Drain tile | $30 | $30 | $60 |
Elevator* | $200 | $50 | $250 |
Electric service upgrade/temporary service | $45 | $25 | $70 |
Electrical work/alarm system | $45 | $25 | $70 |
Fascia, soffit and gutter replacement | No fee | No fee | No fee |
Fence | $30 | $25 | $55 |
Fill/land balance | $90 | $25 | $115 |
Fireplace | $25 | $25 | $50 |
Fire alarm system* | $45 | $25 | $70 |
Fire suppression* | $100 | $50 | $150 |
Type of Permit | Permit | Review | Total |
Type of Permit | Permit | Review | Total |
Foundation repair | No fee | No fee | No fee |
Furnace replacement | $30 | $25 | $55 |
Gazebo/pagoda | $30 | $25 | $55 |
Garage door | No fee | No fee | No fee |
Hot water heater replacement | No fee | No fee | No fee |
Hot tub or spa | $70 | $25 | $95 |
Landscaping “pertaining to grading”** | $100 | $25 | $125 |
Lawn sprinkler** | $125 | $25 | $150 |
Mailbox | $25 | $10 | $35 |
Mud jacking | No fee | No fee | No fee |
Parking lot expansion | $45 | $25 | $70 |
Playhouse/swing set | No fee | No fee | No fee |
Plumbing replacement of fixtures | $55 | $25 | $80 |
POD residential property | $15 | No fee | $15 |
Radio or TV tower antenna | $10 | $25 | $35 |
Re-inspection fees | $50 | No fee | $50 |
Re-roof | No fee | No fee | No fee |
Satellite dish | $25 | $25 | $50 |
Sewer repair | $30 | $25 | $55 |
Shed | $45 | $25 | $70 |
Siding replacement | No fee | No fee | No fee |
Starting work without permit | $75 | No fee | $75 |
Stop work order | $75 | No fee | $75 |
Type of Permit | Permit | Review | Total |
Type of Permit | Permit | Review | Total |
Swimming pool in-ground** | $350 | $50 | $400 |
Swimming pool above ground** | $150 | $50 | $200 |
Tank removal/install | $45 | $25 | $70 |
Temporary office trailer | $90 | $25 | $115 |
Tuck pointing/masonry work | No fee | No fee | No fee |
Water softener | No fee | No fee | No fee |
Well (total fee, including 3-year operating permit of $45) | $275 | $25 | $345 |
Window replacement | No fee | No fee | No fee |
*Outside consultants are used for these reviews, for which the fees are passed onto the permit applicant.
**Requires a $1000 bond to be posted to insure that all issues are met with the project.
Bond will be refunded once final inspections have passed.
(H) Consultant fees. If the village, at its sole discretion, retains consultant(s) to review plans, workmanship, materials and other issues associated with the building or construction of any improvements, then, in addition to those other fees and costs under this section, the applicant shall also pay the village all costs incurred and associated with such consultant(s).
(Ord. 1319, passed 9-17-90; Am. Ord. 1347, passed 4-29-91; Am. Ord. 1449, passed 3-7-94; Am. Ord. 1951, passed 3-3-03; Am. Ord. 2595, passed 6-15-09)