§ 152.052 WHEN CONSTRUCTION MAY PROCEED; RESTRICTIONS.
   After receipt of conditional approval of the regulatory floodway change and issuance of a permit and a Conditional Letter of Map Revision, construction as necessary to change the regulatory floodway designation may proceed but no buildings or structures or other construction that is not an appropriate use may be placed in that area until the regulatory floodway map is changed and a final Letter of Map Revision is received. The regulatory floodway map will be revised upon acceptance and concurrence by IDNR-OWR and FEMA of the “as built” plans.
(Ord. 3187, passed 1-22-2019) Penalty, see § 152.999