Within the regulatory floodway as identified on the regulatory floodway maps designated by IDNR-OWR, the construction of an appropriate use, will be considered permissible provided that the proposed project meets the following engineering and mitigation criteria and is so stated in writing with supporting plans, calculations and data by a registered professional engineer and provided that any structure meets the protection requirements of §§ 152.080 through 152.087.
(Ord. 3187, passed 1-22-19)