The time limitations for the demolition of the structure and the cleaning of the site are established as follows:
(a) A time limit of 30 days shall be allowed for the demolition of single-family dwelling structures and accessory structures thereto, including the clearing of the site. In addition to the 30-day period, not more than an additional 90 days shall be allowed for the filling of any excavation to grade level; however, the excavation need not be filled, provided construction of some other structure which would utilize the excavation has been commenced within the 90-day period.
(b) A time limit of 60 days shall be allowed for the demolition of multiple-unit residential structures, commercial structures, and industrial structures, including accessory structures thereto and the clearing of the site. In addition to the 60-day period, not more than an additional 60 days shall be allowed for the filling of any excavation to grade level; however, the excavation need not be filled, provided the construction of some other structure which would utilize the excavation has been commenced within the 60-day period.
(Ord. 2010-24. Passed 4-20-10.)