§ 156.076 COMMERCIAL AND INDUSTRIAL SUBDIVISIONS.
   (A)   It is recognized that the subdivider, in creating commercial and industrial subdivisions, faces unique problems of lot design not normally encountered in residential subdivisions. For this reason, the initial emphasis of the Commission shall be upon street layout and block arrangement. Generally, the procedural requirements shall be for the owner to follow the regular procedure outlined in these regulations. However, the subdivider need show only two lots along with the street and block layout. Then from time to time, as prospective buyers or users express interest in lots sized to their required specifications, the owner shall submit an amendment to the approved recorded subdivision plat for consideration.
   (B)   Regular procedural requirements of the Commission following the receipt of a final subdivision plat shall then apply, except those streets that have been built by following an approved set of plans on the previously approved secondary plat shall not have to be rebuilt because of the adoption of new criteria by the town. This shall also apply to storm drainage facilities within the subdivision unless runoff characteristics have been changed by the newly proposed improvements or unauthorized existing improvements.
   (C)   Drainage must meet all the requirements under Chapter 53 (Stormwater Drainage, Erosion and Sediment Control Regulations).
(Ord. 2020-1D, passed 1-6-20)