§ 52.110 INDUSTRIAL MONITORING.
   (A)   The town will inspect, sample and analyze industrial discharges in the following manner:
      (1)   The sample types will be the same type as required in the IWP issued by the controlling legal authority;
      (2)   The samples will be collected at the sample location specified in the IWP issued by the controlling legal authority;
      (3)   A sampling and inspection program shall be inspected for, at a minimum, all IWP facilities. IWP facilities will be inspected at least annually;
      (4)   Samples will be collected at least quarterly;
      (5)   The analytical results of the samples will be submitted to the town and IDEM PUWWS by the twenty-eighth day of the month following the month in which the samples were taken;
      (6)   The town will keep a record of each industrial inspection it performs. A copy of each inspection report will be sent to the PUWWS within 15 days of its completion.
   (B)   The town will immediately sample and analyze the POTW influent and effluent for suspected pollutant(s) when the POTW operation is upset. The town will immediately contact PUWWS and the Compliance Evaluation Section by telephone at the time of the occurrence. The results of each analysis conducted as a result of an upset will be submitted to PUWWS.
(Ord. 2000-11B, passed 11-28-00)