10-1-4: PLACEMENT OF FINISHED SLAB:
Pertaining to all future construction, the top of finished slab shall be a minimum of sixteen inches (16") above original dirt grade and sixteen inches (16") above the floodplain, where applicable. (Ord. 2000-4-1, 4-10-2000)
Placement of finished slab and subsequent grading shall not alter the existing stormwater drainage onto or off of the property unless authorized by the building director/code officer, however under no circumstances shall the drainage be altered in such a manner as to adversely affect neighboring properties. (Ord. 2008-001, 2-11-2008)