10-2-7: INSPECTIONS:
   A.   Notification: The inspector shall be notified when the work is ready for inspection and test, by registering the number of the permit and the location of the work in the register book kept for that purpose in the office of the inspector. All work shall be left uncovered for examination.
   B.   Final Inspection: After all the fixtures have been placed in position and the work completed, a final test shall be made by the inspector, and if found to be tight and in accordance with this Chapter, the inspector shall so certify on the face of the permit and no plumbing shall be used until such certificate is made by the inspector. (Ord. 81, 9-2-1915; amd. 1999 Code)