§ 154.025 FIELD INSPECTION.
   (A)   All public improvements to be made under the provisions of this chapter shall be inspected on a regular basis by the subdivider’s engineer. The frequency and duration of such inspections shall be adequate to ensure that all improvements are constructed in strict accordance with the plans and specifications approved by the village. The subdivider’s engineer shall provide written certification that all improvements have been properly installed.
   (B)   The village’s designated officer or employee in charge of public works and the Village Engineer shall be notified whenever construction is being done so that they may conduct independent inspections as deemed necessary.
   (C)   The subdivider shall provide three copies of construction record drawings of all improvements completed to the village. These drawings shall be accurately dimensioned. Sanitary sewer manhole rims and invert elevations, water main locations, water service and sanitary sewer service locations shall be shown on the construction record drawings.
   (D)   The construction record drawings shall be a condition of final acceptance of the improvements and release of the surety bond or letter of credit.
(Prior Code, § 8-2-6) (Ord. 2015-16, passed 8-3-2015)