§ 157.26 POST-CONSTRUCTION CERTIFICATIONS REQUIRED.
   The following as-built certifications are required after a floodplain development permit has been issued:
   (A)   For new or substantially improved residential structures, or nonresidential structures that have been elevated, the applicant shall have a Federal Emergency Management Agency Elevation Certificate completed by a registered surveyor to record as-built elevation data. For elevated structures in Zone A and Zone AO areas without a base flood elevation, the elevation certificate may be completed by the property owner or owner's representative.
   (B)   For all development activities subject to the standards of § 157.29(A) of this chapter, a Letter of Map Revision.
(Ord. 08-2004, passed 5-17-04)