§ 52.160 LEAST DISRUPTIVE TECHNOLOGY.
   All construction or maintenance of facilities shall be accomplished in the manner resulting in the least amount of damage and disruption of the rights-of-way. In addition, all cable, wire or fiber optic cable installed in the subsurface of the rights-of-way may be required to be installed in conduit, and if so required. no cable, wire or fiber optic cable may be installed under this chapter using “direct bury” techniques.
(Ord. 24-2004, passed 12-20-04) Penalty, see § 52.999