§ 150.251 CONSTRUCTION AND INSPECTION.
   (A)   All relocation, filling and reconstruction of irrigation facilities shall be constructed to standards of the owning utility and the Town Engineer.
   (B)   All improvements in the public right-of-way shall be constructed under the inspection and approval of Town Engineer, Public Works Department and/or utility company having jurisdiction. Construction shall not be commenced until a permit has been issued for the construction by the Town Engineer, and if the town has placed a stop work order against the developer for any reason, the developer shall not resume work until after notifying the town of his or her intent and a the town has released the order to stop work.
   (C)   All underground utilities to be installed in streets shall be constructed prior to the surfacing of the street. Service stubs to platted lots within the subdivision for underground utilities shall be placed to the length as not to necessitate disturbance of street improvements when service connections are made.
(Prior Code, Ch. 4, Art. V, § 4-479) (Ord. 432-06, passed 6-19-2006)