§ 150.133 BUILDING AND OCCUPANCY PERMITS.
   (A)   Prior to the issuance of a building permit, the Planning Director or designee shall review and approve the site plan and landscape plan.
   (B)   In lieu of the installation of plant material prior to issuance of an occupancy permit, a cash deposit or an irrevocable letter of credit in an amount guaranteeing the complete 100% installation of the plant material within six months may be accepted by the Planning Director or designee. Failure to install the material in the six month time period shall be deemed a violation of this Development Code, and the town may use the cash deposit or funds set aside by letter of credit to complete the landscape improvements required.
(Prior Code, Ch. 4, Art. IV, § 4-203) (Ord. 432-06, passed 6-19-2006)