§ 120.36 PREVENTIVE MAINTENANCE PROGRAM.
   The following shall be included as part of the operator's preventive maintenance program:
   (A)   Periodic inspection, and repair if needed, of the headend;
   (B)   Periodic inspection, and repair if needed, of the antenna tower;
   (C)   Periodic weather-proofing and protection of the antenna lead connectors, and on any other exposed fittings if needed;
   (D)   Periodic conducting of signal leakage tests that are in accord with FCC requirements;
   (E)   Periodic servicing, testing, and calibration of equipment including service vehicles, and field test equipment;
   (F)   Periodic testing of the operator's emergency alert system if any;
   (G)   Periodic testing and recording of said test data for all signals (audio and video at the headend and system extremity points;
   (H)   Periodic testing as required by federal law and or regulations; and
   (I)   Compliance with all operating parameters required by FCC rules and regulations, as such may be changed or amended from time to time.
(Ord. O-19-08, passed 11-11-08)