§ 50.021 APPROVAL PROCEDURE.
   Plans submission requirements for review shall be as follows:
   (A)   Concept review.
      (1)   Letter. (To contain the following):
         (a)   A request for plan review and approval.
         (b)   Type of development, such as, residential, commercial, industrial, and the like. Information as to size of development, number of units, and the like shall be included.
         (c)   An estimate of sanitary flow generated by the proposed development.
         (d)   An estimate of cost for the wastewater treatment system, including a separate item for any waste- water treatment plant or wastewater lift station proposed in the design.
         (e)   A time schedule for construction of the development in terms of dwelling units per year or proportion of the estimated flow to be added to the wastewater treatment system.
      (2)   Plans.
         (a)   Four prints showing proposed development on a 200 scale topographic map. This plan should show street layouts, existing sanitary, combined, and storm sewers, including sewer numbers, sizes, grades, locations, and invert elevations. All existing work should be shown with dashed line work. With solid line work, the engineer should show proposed sanitary and storm sewer locations, sizes, grades, and flow arrows (or invert elevations).
         (b)   In lieu of the above, the engineer may elect to submit detailed construction drawings for concept reviews. In such cases, the same number of sets as outlined above will be needed. The letter containing the information requested above will be necessary in either case.
         (c)   A grading plan.
   (B)   Detail review.
      (1)   Prior concept approval.
      (2)   Six sets of detailed plans.
      (3)   Two drainage area maps.
   (C)   Concurrent concept and detail review.
      (1)   If the nature or simplicity of the proposed wastewater treatment system is such that concept and detail reviews can, in the opinion of the Commission or the District, be effectively and efficiently accomplished concurrently, the Commission or the District may elect to do so.
      (2)   Construction plans shall be drawn on at least 24" x 36" sheets to a scale of one inch equals 50 feet. Area plans shall be drawn to a scale of one inch equals 200 feet. Reduced prints will not be accepted.
      (3)   All elevations proposed and shown shall be referenced to sea level datum and each set of plans shall show the description and elevation of the public bench mark used in the development survey.
      (4)   All plans shall bear the signature and seal of the registered Kentucky professional engineer who has prepared them and shall provide space for the approval of the Chief Engineer.
      (5)   Plans requiring the approval of the State of Kentucky Department for Natural Resources and Environmental Protection will be transmitted by the Chief Engineer following his approval.
      (6)   Concept approval of the proposed wastewater treatment system shall become void if plans for detailed review have not been submitted within 12 months from the date of the concept approval letter.
      (7)   Detailed approval of the proposed wastewater treatment system shall become void if construction has not commenced within 12 months and completed within 36 months from the date of the approval for construction letter. Concept and detailed approval may be extended by the Chief Engineer for a period not to exceed 12 months with concurrence of the General Manager.
(Ord. O-38-83, passed 12-20-83)