§ 151.59 REFILLING EXCAVATIONS.
   Any person making such excavation shall, when the same shall be completed, promptly and without delay refill the same as herein provided.
   (A)   In refilling any excavation, the earth shall be thoroughly settled as the refilling progresses by using water to compact earth, or the earth shall be thoroughly tamped in successive layers of approximately six inches in such a manner that all the earth shall be replaced in the excavation leaving the surface in its original condition.
   (B)   In making connection to fire hydrants for flushing excavations, all rules and regulations of the Water Department relating thereto shall be observed.
   (C)   In all cases where excavations are made in the paved district, the earth shall be replaced in the manner above specified, and the Department of Streets shall replace the pavement.
(Prior Code, § 8.8.6)