§ 151.06 PERMIT APPLICATION.
SMALL WIRELESS FACILITIES PERMIT APPLICATION
APPLICANT INFORMATION
 
Applicant Name: __________________________________   Date: _______________________
Applicant is a: __ Carrier/Wireless Provider __ Representative __ Other
Company Name: ________________________________________________________________
Address: _______________________________________________________________________
City: ____________   State: ____________________   ZIP Code: _______________________
Phone: ______________________   Email: ________________________________________
 
PROPOSED SITE LOCATION
Property Address: _______________________________________________________________
City: _________________________   State: _______________   ZIP Code: _______________
Closest Intersection (Distance and Direction from):
_______________________________________________________________________________
_______________________________________________________________________________
 
EXISTING POLE/STRUCTURE INFORMATION
 
New Pole/Structure Construction? __ Yes __ No
Pole/Structure ID Number: _______   Height of Pole/Structure (feet): ______   Pole Color: _____
Existing Attachment(s) on Pole/Structure? (e.g. banners, light fixtures) ___ Yes ___ No
Existing Structure Owner: ________________________________________________________
Name of Structure Owner Representative: ___________________________________________
Address: ______________________________________________________________________
City: __________   State: ____________   ZIP Code: __________
Phone: __________   Email: _________________   Fax: ______________________
 
PROPERTY OWNER INFORMATION
 
In the event that the proposed small wireless facility is to be attached to an existing pole owned by an entity other than the Village, the wireless provider shall provide legally competent evidence of the consent of the owner of such pole to the proposed collocation. Permission has been granted by property owner? ___ Yes ___ No
Name: ________________________________________________________________________
Address: ______________________________________________________________________
City: ____________   State: ________________   ZIP Code: _______________
Phone: ____________________   Email: ______________________
 
APPLICATION REQUIREMENTS
 
The following documents must be attached or included for the Application to be complete:
__ Application fee(s)
__ Site specific structural integrity, AND for a municipal utility pole
__ Make-ready analysis prepared by a structural engineer
__ The location where each proposed small wireless facility or utility pole would be installed
__ Photographs of the proposed site location and its immediate surroundings
__ Specifications and drawings prepared by a structural engineer for each proposed small wireless facility
__ The equipment type and model numbers for the antennas and all other wireless equipment associated with the small wireless facility
__ A proposed schedule for the installation and completion of each small wireless facility, if approved
__ Proof of permission granted by property owner, if existing pole not owned by the Village
 
ATTESTATION, ACKNOWLEDGMENT & SIGNATURE
 
I attest to the best of my knowledge and belief, that the information stated in this application and in all supporting plans and documents is true and accurate. To the best of my knowledge, I certify that the proposed collocation complies with the terms of the “Collocation Requirements and Conditions” section of the Village of Flanagan’s Small Wireless Facility Deployment Ordinance No. 18-____
Signature of Applicant: ______________________________   Date: _______________________
Printed Name of Applicant: ____________________________   Title: ____________________
 
**FOR ADMINISTRATIVE USE ONLY**
 
Date Application was submitted: ______________________________
Application is: ___ Complete   ___ Incomplete
If incomplete, date the Applicant was notified: _____________________________
Missing documents or information: _________________________________________________________________________________ _________________________________________________________________________________ ____
 
(Document, “Small Wireless Facilities Permit Application”)