937.12 BOND.
(a) If a Storm Water Pollution Prevention Plan is required by this regulation; Soil Disturbing Activities shall not be permitted until a cash bond, construction bond, irrevocable letter of credit, or other security as pre-approved by the City of Findlay Engineer, and has been deposited with the City of Findlay. The bond amount shall be determined with an engineer's estimate. The bond will be used for the City of Findlay to perform the obligations otherwise to be performed by the owner of the development area as stated in this regulation and to allow all work to be performed as needed in the event that the applicant fails to comply with the provisions of this regulation.
(b) No project subject to this regulation shall commence without a SWP3 prepared by a qualified professional is on record with the City Engineering Department.
(Ord. 2015-038. Passed 5-19-15.)