937.07 APPLICATION PROCEDURES.
(a) Storm Water Pollution Prevention Plan (SWP3): The applicant shall submit any established application fee with the required number of plans consistent with the application for final plat, improvement plans, or other application for which drainage control or land disturbance activity is warranted or will be performed. The plans shall be prepared by a CPESC Certified Professional Engineer. The Plan shall show the proposed property boundaries, setbacks, dedicated open space, public roads, water resources, storm water control facilities, and easements. The SWP3 shall summarize the engineering analysis to allow the City of Findlay Engineer to determine if the site is designed to meet the intent of this Chapter and if the proposed storm water management practices are capable of controlling runoff from the site in compliance with this regulation. The SWP3 shall meet the requirements of Section 937.09 and shall be on record with the City of Findlay Engineering Department prior to any Land Clearing or Soil Disturbing Activity, approval of the final plat or before issuance of a zoning permit by the Zoning Inspector.
(b) Review and Comment: The City of Findlay Engineer and/or the MS4 Coordinator shall review the Plans submitted for completeness, and may issue comments and recommendations for revisions. A Plan rejected because of deficiencies shall be resubmitted when deficiencies have been corrected.
(c) Plan Required: Land clearing or Soil Disturbing Activities shall not begin, and zoning or building permits shall not be issued without prior submission of an SWP3, when required.
(d) Validity: A SWP3 shall remain valid for a timeframe corresponding with type of project for which the application was made.
(Ord. 2015-038. Passed 5-19-15.)