§ 152.43 CONSTRUCTION PLANS AND SPECIFICATIONS.
   (A)   The plans and specifications prepared for the construction of the storm water management system must be:
      (1)   Consistent with the storm water management plan approved by the City Engineer, including any special provisions or conditions;
      (2)   In conformance with the requirements of the city and any other necessary permits required and issued by other governmental agencies;
      (3)   Sealed and signed by a professional engineer registered in the state;
      (4)   Submitted to the City Engineer for approval;
      (5)   Approved by the City Engineer prior to commencing construction; and
      (6)   Site plan reviews shall be documented by the city to achieve compliance with MS4 permitting requirements.
   (B)   The construction grading and erosion/sediment control plans, in a format acceptable to the City Engineer, shall contain a drawing or drawings delineating the features incorporated into the storm water pollution prevention plan (SWPPP) including details of perimeter protection, construction phasing, storm drain inlet protection, erosion control measures, temporary and final stabilization measures, including all BMPs. In addition, the construction specifications shall contain technical provisions describing erosion, sedimentation and water control measures to be utilized during and after construction as well as to define the entities responsible for the installation and maintenance of the BMPs. The project SWPPP must be incorporated into the construction specification documents.
(2002 Code, § 3.94) (Ord. 109, Sixth Series, effective 6-25-2009; Ord. 24, Seventh Series, effective 5-23-2015; Ord. 31, Eighth Series, effective 12-11-2023)