(a) Residential Construction Fee Schedule.
(1) Plan review
$80.00
(2) Plan modifications or altered fees
for second review
80.00
(3) Inspections:
A. Footers
65.00
B. Foundation
65.00
C. Rough Framing
65.00
D. Rough Plumbing
65.00
E. Rough Mechanical
65.00
F. Rough Electrical
65.00
G. Insulation
65.00
H. Final Building Inspection
65.00
I. Electrical Service Inspection
65.00
J. Final Electrical Inspection
65.00
(4) Failed inspections return for re-inspection
fees
65.00 ea.
(b) Commercial Construction Fee Schedule.
(1) Plan review
$400.00
(2) Plan modifications or altered fees
for second review
400.00
(3) Inspections:
A. Footers
65.00
B. Foundation
65.00
C. Rough Framing
65.00
D. Rough Plumbing
65.00
E. Rough Mechanical
65.00
F. Rough Electrical
65.00
G. Insulation
65.00
H. Final Building Inspection
65.00
I. Electrical Service Inspection
65.00
J. Final Electrical Inspection
65.00
(4) Failed inspections return for re-inspection
fees
65.00 ea.
(Passed 10-5-06; 12-6-07)