Each user, at the time he or she is connected with the waterworks system, shall pay a tapping fee to cover the cost of tapping the main, furnishing and laying service pipe, service and meter box and installing the meter at the cost of $500, plus cost of materials. In the event that boring under any street is required for installation, the cost of said boring shall be paid by the user.
(Ord. 2000-5, passed 10-2-2000)