§ 153.04 CONSTRUCTION PERMITS.
   Requests for permits to construct communications facilities shall be submitted upon forms to be provided by the city, and shall be accompanied by drawings, plans, and specifications in sufficient detail to demonstrate:
   (A)   The facilities will be constructed in accordance with all federal, state, and city applicable codes, rules, and regulations;
   (B)   The facilities will be constructed in accordance with any applicable franchise agreement;
   (C)   The location and route of all facilities to be installed aboveground or on existing utility poles;
   (D)   The location and route of all facilities on or in the public rights-of-way to be located under the surface of the ground, including the line and grade proposed for the burial at all points along the route within the city. Existing facilities shall be differentiated on the plans from new construction. If requested, a cross section shall be provided showing new or existing facilities in relation to the street, curb, sidewalk, or right-of-way; and
   (E)   The construction methods to be employed for protection of existing structures, fixtures, and facilities within or adjacent to the public rights-of-way, and the description of any improvements that the applicant proposes to temporarily or permanently remove or relocate.
(Ord. 557-2019, passed 12-9-2020)