Wireless communication monopole tower constructed up to, but not including, 200 feet in height above the finished grade, unless a lesser height is technically feasible to service the geographical service area of the applicant and potential co-locators.
All applicants shall be required to construct or locate on a base tower structure and structure foundation that is designed to be buildable up to, but not including, 200 feet above the finished grade. Such structure shall be designed to have sufficient structural capacity for the Village to allow for at least three providers to be located on the structure when constructed to the maximum allowable height. The wireless communication facility shall also be designed to show that the applicant has enough space on its site plan for an equipment building large enough to accommodate at least three users. If an equipment building is initially constructed to accommodate only one user, space shall be reserved on site for equipment building expansions to accommodate at least three users. The maximum size of above-ground equipment buildings is 300 square feet for one provider and no more than 750 square feet in total.
Towers and antennas shall be designed in accordance with the Ohio Basic Building Code for winds and design loads.
(Ord. 98-37. Passed 6-2-98.)