907.19 CONSTRUCTION PERMIT.
   (a)    Facilities Operators are required to obtain a construction permit pursuant to Chapter 905.07 Public Rights-of-Way prior to commencing any of the following activities:
      (1)    Collocation of small cell equipment on a Wireless Support Structure;
      (2)    Replacement, modification, repair, or maintenance of small cell equipment;
      (3)    Construction, replacement, modification, repair, or maintenance of a Wireless Support Structure associated with a small cell facility; and
      (4)    Any excavation of the Right-of-Way in connection with the activities described in this subsection (a).
   (b)    The construction permit fee shall be the fee set forth in Chapter 905.07.
(Ord. 2018-086. Passed 10-16-18.)