APPENDIX III. PRELIMINARY PLAT CHECKLIST.
SUBDIVISION RECORD   DATE SUBMITTED_____________________
PRELIMINARY PLAT
Name of Subdivision _________________________________
Location ___________________________________________
Owner _____________________________________________
Land Planner______________ Address ____________________ Tel. ______________
Surveyor _________________ Address ____________________ Tel. ______________
CHECKLIST
_____   Vicinity map embracing subdivision and surrounding area.
_____   Six copies of preliminary plat.
_____   Scale: 1 inch = 100 feet or larger.
_____   Name of subdivision and owner.
_____   North point, graphic scale, date.
_____   Boundaries of tract with bearings and distances.
_____   Names of adjoining property owners or subdivisions.
_____   The location of existing sewers, water and gas mains and other utilities.
_____   The location of existing streets, easements, bridges, culverts, railroads, watercourses and the like.
_____   Names, locations and approximate dimensions of proposed streets, easements, parks and reservations, lot lines and the like.
_____   Contour map, if required.
_____   Proposed lot lines, building lines and approximate dimensions.
_____   Lot and block numbers.
_____   Zoning classification, if any, on the land to be subdivided and on adjoining land.
_____   Conforms to general requirements and minimum design standards.
Certification of Approval by District Highway Engineer ___________________ (date)
Certification of Approval by County School Superintendent __________________ (date)
Certification by Registered Engineer ____________________ (date)
Certification of water supply and sewage disposal system by County
Health Officer ___________________________ (date)
Certification of Approval by County Auditor __________________________ (date)
Certification of Approval by U.S. Army Corps of Engineers _______________________ (date)
Approved ______________ to proceed to final plat.
(Ord. passed 5-31-1977)