Section 9.1.40. Approval of Site Plan Procedure.
   A.   The Site Plan approval process shall include the following:
      1.   Submit Application to Fairfield Town. (www.fairfieldtown.org/);
      2.   Upload site plan and other required documents (PDF ONLY);
      3.   The Building Department will check that all required plans and documents have been submitted;
      4.   The Planning Commission will require a recorded survey and subdivision plat if applicable;
      5.   The Planning Commission will review the site plan at the next regular meeting; and
      6.   The Planning Commission shall review the site plan and building elevations. The Planning Commission shall confirm compliance with architectural design, zoning and any other standards for buildings and structures to assure compliance with the general plan and with the Town's generally applicable policies and regulations.
   G.   Once the Planning Commission is satisfied that all requirements have been met, they will approve the site plan. The applicant may then apply for a building permit.