§ 92.093 MATERIAL, MACHINERY OR OTHER THINGS FOR THE CONSTRUCTION OF VAULTS, MAUSOLEUMS, MONUMENTS OR OTHER STRUCTURES; REGULATIONS.
   No material, machinery or other thing for the construction of vaults, mausoleums, monuments or other structures or monuments themselves, may be brought into the cemetery until required for immediate use; nor, under any circumstances, when a funeral is in progress; nor between Saturday noon and Monday morning; nor on a holiday; and no work shall be done during the time; nor shall the material be placed on lots adjoining the one on which a structure is to be erected, without special permission from the sexton.
(1986 Code, § 4.08.320)