§ 55.037 CONNECTION OF FACILITIES TO PUBLIC SEWER; PERIOD OF COMPLIANCE; SPECIFICATIONS OF FILL-IN.
   When a public sewer becomes available, the building sewer shall be connected to the sewer within 60 days and the private sewage disposal system shall be cleaned of sludge and filled with clean bank-run gravel or dirt.
(1986 Code, § 7.26.080) (Ord. 1240, passed - -1984)