§ 12.24.060 EXCAVATION, REFILLING AND TAMPING.
   (A)   The cutting, opening or excavation specified in the permit and the laying, replacing and repairing of any pipe, conduit or sewer therein shall be done by the applicant in accordance with the requirements set down by the Superintendent of Streets, and the opening, cut or excavation shall be filled in as soon as reasonably practicable by the applicant, up to the street surface of any concrete, macadam or other surface of any such street.
   (B)    The backfilling shall be done by the applicant and shall be accomplished by application of a pneumatic jack tamper or other method acceptable to the Superintendent of Streets to thoroughly and completely tamp the refilled dirt, gravel or other material.
(Prior Code, § 12.24.060)