The fees for permits and inspections shall be as listed in the tables below. In the event of any land use or building construction without all of the permits required therefore, the fees established herein for those permits are hereby doubled.
Residential Permit Fees
| ||
Zoning
|
Building
|
Residential Permit Fees
| ||
Zoning
|
Building
| |
Single family | $65.00 | $0.239.SF |
Modular home | $65.00 | $250.00 |
Manufactured home | $65.00 | $250.00 |
Two family | $65.00 | $0.239/SF |
Townhome | $65.00 | $0.239/SF |
Multi family | $65.00 | $0.239/SF |
Addition | $65.00 | $0.239/SF |
Interior renovation/repair | $0.239/SF | |
Basement remodel | $200.00 | |
Accessory building (<=200 sq. ft.) | $35.00 | |
Accessory building (>200 sq. ft.) | $35.00 | $100.00 |
Deck | $35.00 | $100.00 |
Covered deck | $35.00 | $100.00 |
Demolition | $75.00 | |
Driveway | $35.00 | |
Electrical alteration | $50.00 | |
Mechanical alteration (HVAC) | On Application | |
Fence (<=6 ft high) | $35.00 | |
Fence (>6 ft high) | $35.00 | $50.00 |
Detached garage | $35.00 | $250.00 |
Move & set | $50.00 | $350.00 |
Covered porch | $35.00 | $100.00 |
Above ground pool | $35.00 | |
Inground pool | $35.00 | $150.00 |
Structural repair | $150.00 | |
Retaining wall | $35.00 | $175.00 |
Other accessory uses | $35.00 | |
Other residential uses | $75.00 | |
Home occupation | $75.00 | |
Reinspection fee (after 1 free) | $75.00 | |
Plan revision fee (after 1 free) | $75.00 | |
Construction w/o permit | Building permit fee = permit fee +(permit fee or $500.00 whichever is greater) | |
Zoning permit fee = permit fee + permit fee | ||
Deck- Building = $100.00+($100.00 or $500.00 (whichever is greater) = $600.00 Zoning =$35.00 + $35.00 = $70.00 | ||
Board of Adjustment | Request for variance/change from one nonconforming use to another - filing fee = $340.00 | |
Conditional use permit - filing fee = $375.00 | ||
Appeal of Zoning Administrator - filing fee = $480.00 | ||
Commercial Permit Fees
| ||||
Zoning
|
Building
|
Commercial Permit Fees
| ||||
Zoning
|
Building
| |||
New building or building addition | $200.00 | $0.125/SF ($750 minimum, $15,000 maximum) | ||
Alteration/Tenant finish | $0.10/SF ($500 minimum, $10,000 maximum) | |||
Cell tower | $250.00 | |||
Change of use | $75.00 | |||
Deck | $35.00 | $225.00 | ||
Demolition | $200.00 | |||
Electrical alteration | $200.00 | |||
Fence (<=6 ft high) | $35.00 | |||
Fence (>6 ft high | $35.00 | $150.00 | ||
Fire alarm | $275.00 | |||
Fire suppression | $275.00 | |||
Mechanical alteration (HVAC) | On Application | |||
HVACR installation | Per 815 KAR 8:070 | |||
Inground pool | $35.00 | $350.00 | ||
1st $1,000 market value | Each additional $1,000 | Each million after 1st | ||
Range hood | $275.00 | |||
Range hood suppression | $275.00 | |||
Structural repair | $300.00 | |||
Sign | $65.00 | $140.00 | ||
Retaining wall | $300.00 | |||
Site and foundation | $250.00 | |||
Other commercial uses | $250.00 | |||
Other accessory uses | $35.00 | |||
Reinspection fee (after 1 free) | $75.00 | |||
Plan revision fee (after 1 free) | $75.00 | |||
Construction w/o permit | 2 x permit fee | |||
Board of Adjustment | Request for variance/change from one nonconforming use to another - filing fee = $340.00 | |||
Conditional use permit - filing fee = $375.00 | ||||
Appeal of Zoning Administrator - filing fee = $480.00 | ||||
Electrical Inspection Fee Schedule |
Electrical Inspection Fee Schedule | |
General | |
1. Residential construction temporary | $40 |
Residential temporary release of permanent service, single-family | $35 |
Residential temporary release of permanent service with rough in | No charge |
Two-family and multi-residence | $35 |
Service disconnect/reconnect release to utility | $10 |
Nonresidential construction temporary and temporary release of permanent service | |
200 Amperes or less | $40 |
201 Amperes to 600 Amperes | $60 |
Electrical Inspection Fee Schedule | |
601 Amperes and greater | $80 |
2. Residential underground service lateral inspection or over ground | $35 |
With rough-in or temporary release of permanent service | No charge |
3. 98% complete or occupancy to City Building Department (nonresidential only) | $40 |
4. Re-inspection, incomplete or faulty work, no access, no or wrong address and the like | |
Residential | $35 |
Nonresidential | $40 |
5. Emergency inspection (during normal business hours, in addition to normal fee) | $40 |
When an emergency inspection is requested by the city, the emergency fee shall be paid by the contractor engaged to complete any work | |
6. Phone booth, stand or bus stop shelter | $60 |
7. Mobile home/manufactured home | $60 |
8. Detached miscellaneous (stables, barns, garages, out buildings and the like) | |
First trip | $65 |
Each additional trip | $35 |
9. Signs (internally illuminated) and billboards and the like | |
First sign or billboard | $60 |
Each additional sign or billboard on the same trip | $25 |
Neon outline lighting (up to 3 transformers) | $60 |
Each additional transformer | $12 |
10. Field consultation (per half hour) | $45 |
11. Swimming pool/fountain/hot tub | |
Bonding - first trip | $55 |
Bonding - each additional trip | $35 |
Wiring - first trip | $60 |
Wiring - each additional trip | $35 |
Bonding and wiring on same trip | $75 |
12. Reproduction of record | $12 |
Stored records | $23 |
13. Records change: change of address, corrected certificate and the like | $5 |
14. Minimum fee per trip | |
Residential | $35 |
Nonresidential | $40 |
The basic permit fee includes one in-progress inspection and 1 final inspection. Unless otherwise specified, all additional inspections are charged the minimum fee per trip. | |
15. A separate permit is required for signs and pools. | |
16. Work in progress without proper applications and permits. | Double fee (maximum of $225) |
17. Canceled inspections | |
Before 8:30 a.m. | No charge |
After 8:30 a.m. | Regular charge, plus re-inspection fee |
18. Canceled permits | New permit required plus all fees |
19. Late payment fee | $29 or 2% of balance, whichever is greater |
All payments shall be in the inspector’s office by the 25th of the month | |
20. A 3% service charge will be added to all credit card charges. | |
Survey Fees | |
When a survey is requested by the city, the survey fee shall be paid by the contractor that corrects the work as outlined in the survey. | |
Survey fees are in addition to plan review and electrical field inspection fees. | |
1. Residential unit | |
First unit | $70 |
Additional unit and house, each | $12 |
2. Nonresidential | |
Each building per floor | $70 |
Portion of floor (not exceeding 50% of floor area) | $65 |
Individual unit or store in a complex | $65 |
Service equipment only | $65 |
Electrical Inspection Fee Schedule | |
Residential: New Construction and Additions to Existing Structures | |
Single-family residence, townhouse, condominium and the like (includes 1 rough-in and 1 final inspection) | |
1. Single-family residence, townhouse, condominium - 1,500 sq. ft. or less | $100 |
Single-family residence, townhouse, condominium - 1,501 to 2,500 sq. ft. | $112 |
Single-family residence, townhouse, condominium - 2,501 to 3,500 sq. ft. | $124 |
3,501 sq. ft. or more | $124 plus $12 for each 1,000 sq. ft or fraction thereof |
2. Two-family residence | $112 |
Apartments per building (3 to 12 units) (includes 1 rough-in and 1 final inspection) | |
1. First 3 units | $132 |
Each additional unit, house meter or common area | $24 |
2. Re-inspection - first 2 units | $35 |
Each additional unit, house meter or common area (if on same trip) | $5 |
3. Over 12 units per building | Based on nonresidential service ampacity |
Residential Existing Structures | |
1. Service only - first meter | $65 |
Each additional meter | $20 |
(No other electrical work, with or without panel, 1 inspection trip) | |
2. Added wiring, alterations or extensions | |
Per single-family residence or apartment, 1 trip | $65 |
Plus for each additional residence, apartment, house or meter | $20 |
3. Service and added wiring, alterations or extensions | |
Per single family residence or apartment, 1 trip | $80 |
Plus for each additional residence, apartment, house or meter | $20 |
4. Service and rewire - 1 trip | |
First single-family residence or apartment | $80 |
Plus for each additional residence, apartment, house or meter | $20 |
5. Course of construction inspection, remodel areas, fire damage | |
Per trip minimum | $35 |
Heating or cooling - added or replaced - with or without branch circuit wiring (1 trip) | |
1. First component of equipment | $60 |
2. Each additional component | $12 |
Motors or appliances - added or replaced - fixed or stationary - with or without branch circuit wiring (1 trip) | |
1. First piece or equipment | $60 |
2. Each additional piece or equipment | $12 |
Low voltage wiring (less than 110 volts) - added or replaced - per inspection trip | |
1. Residential structures | $55 |
2. All other structures per floor | $70 |
3. Energy management systems (each building and/or per floor) | $65 |
Nonresidential: new construction and added wiring (includes 1 rough-in and 1 final inspection) | |
1. Service only (no other electrical work - 1 trip) per service | |
200 Amps or less | $65 |
201 Amps to 600 Amps | $80 |
601 Amps to 1,200 Amps | $115 |
1,201 Amps or more | $225 |
2. New construction, per amperes of all services, per amp. (maximum of 600 volts) | $0.40 |
Plus | |
For each transformer or generator | |
3 through 50 KVA | $40 |
51 through 150 KVA | $55 |
151 through 500 KVA | $80 |
501 KVA or more | $110 |
Minimum fee | $65 |
(Services over 600 volts shall have their Ampacity calculated at the 600 volt level) | |
3. Added wiring - service and/or feeder installation | |
Service fee from Part 1 | |
Electrical Inspection Fee Schedule | |
Plus | |
Total amperes of all feeders, per amp (minimum $40) | $0.40 |
Plus | |
Per circuit from each separate panel (minimum $35) | $4 |
Plus | |
For each transformer or generator | |
3 through 50 KVA | $40 |
51 through 150 KVA | $55 |
151 through 500 KVA | $80 |
501 KVA or more | $110 |
Minimum fee | $65 |
4. Added wiring - no service or feeder | |
Base fee | $57 |
Plus | |
Per circuit (minimum $35) | $4 |
Plus | |
For each transformer or generator | |
3 through 50 KVA | $40 |
51 through 150 KVA | $55 |
151 through 500 KVA | $80 |
501 KVA or more | $110 |
Minimum fee | $65 |
5. Minimum fee per trip | $40 |
6. All inspections that have a security checkpoint that must be passed, minimum per trip | $57 |
Carnivals, circuses, fairs and similar outdoor events | |
1. Service installation (per service) | $60 |
Plus for each transformer and generator | $40 |
2. Feeder installation (per amp) plus | $0.40 |
Plus per circuit from each separate panel | $4 |
Electrical Inspection Fee Schedule | |
Plus for each transformer or generator | $40 |
3. No feeder installation | $57 |
Plus per circuit | $4 |
Plus per transformer and generator | $40 |
4. Temporary release of meter (per meter) | $40 |
The above fees are applicable only during regular business hours. For after hour inspections Monday through Friday, add $50 per hour (minimum 2 hour charge) to the normal fee. For inspections on weekends and holidays, add $75 per hour (minimum 2 hour charge) to the normal fee. | |
Electrical Plan Reviews | |
Electrical drawings, specifications and data shall be submitted for plan review for new buildings and structures and structural additions to all buildings and structures, for dwelling load calculations. Drawings, specifications and data shall be submitted with the application for plan review. | |
Electrical plan review fees for dwellings and all other buildings, structures and additions and alterations to same. | |
Basic permit processing and certificate fee (all permits, non-refundable) | $37.50 |
New Construction, Service, Service and Feeder or Feeder Only | |
1. For 120/240V 1-phase 3 wire, 120/208V 3-phase 4 wire, 230V 3-phase 3 wire service, feeder or any combination thereof | |
200 Amperes or less | $60 |
201 to 400 Amperes | $65 |
401 to 600 Amperes | $75 |
601 to 800 Amperes | $100 |
801 to 1,000 Amperes | $125 |
1,001 Amperes or more | $125 |
Plus per each Ampere over 1,001 Amperes | $0.05 |
2. For 480V 3-phase 3 wire, 277/480V 3-phase 4 wire, 600V 3-phase 3 wire service or any combination thereof | |
200 Amperes or less | $60 |
201 to 400 Amperes | $65 |
401 to 600 Amperes | $90 |
601 to 800 Amperes | $125 |
801 to 1,000 Amperes | $175 |
1,001 Amperes or more | $175 |
Plus per each Ampere over 1,001 Amperes | $0.10 |
3. For service wiring over 600V, fee will based on the voltage and amperage that is established at the first (main) premises wiring distribution transformer. | |
Alterations, Modifications and Additions to Existing Wiring Systems | |
Service Wiring | |
1. For 120/240V 1-phase 3 wire, 120/208V 3-phase 4 wire, 240V 3-phase 3 wire service, feeder or any combination thereof | |
200 Amperes or less | $60 |
201 to 400 Amperes | $65 |
401 to 600 Amperes | $75 |
601 to 800 Amperes | $100 |
801 to 1,000 Amperes | $125 |
1,001 Amperes or more | $125 |
Plus per each Ampere over 1,001 Amperes | $0.05 |
2. For 480V 3-phase 3 wire, 277/480V 3-phase 4 wire, 600V 3-phase 3 wire service or any combination thereof | |
200 Amperes or less | $60 |
201 to 400 Amperes | $65 |
401 to 600 Amperes | $90 |
601 to 800 Amperes | $125 |
801 to 1,000 Amperes | $175 |
1,001 Amperes or more | $175 |
Plus per each Ampere over 1,001 Amperes | $0.10 |
3. For service wiring over 600V, fee will based on the voltage and amperage that is established at the first (main) premises wiring distribution transformer. | |
Service and Feeder Wiring | |
See above Service Wiring, plus $0.05 per each ampere over a combined feeder rating of 200 amperes | |
Feeder Wiring Only | |
$60 plus $0.05 per each ampere over a combined feeder rating of 200 amperes | |
Electrical Inspection Fee Schedule | |
Branch Circuit Wiring Only | |
1 panelboard (minimum) | $60 |
Each additional panelboard | $12 |
Residential load calculation review | $25 |
(Ord. 2268, passed 1-3-2006; Ord. 2351, passed 12-7-2010; Ord. 2430, passed 4-5-2016; Ord. 2438, passed 8-2-2016; Ord. 2524, passed 7-6-2021)