1052.23 PEAK DEMAND FLOW.
   The sewer service connection and sewer service line to the premises to be served shall be of sufficient size as determined by accepted engineering practice to accept the flow of sewage discharged into the sewer service line by the consumer at peak demand, and in no case less than four inches nominal diameter.
(Ord. 71-51. Passed 10-19-71.)