§ 150.152 SEWERAGE FACILITIES.
   (A)   The developer shall install sanitary sewer facilities in a manner prescribed by the city’s public works standards and the Bear River Health Department.
   (B)   Sanitary sewer facilities in a subdivision development located within the sewer service area shall connect to the public sanitary sewer system as required by the city’s wastewater system ordinance.
   (C)   Sewers shall be installed to serve each lot and to grades and sizes required by the state’s Department of Environmental Quality.
   (D)   All sewer lines must be extended across the entire frontage of all existing streets and to the boundary of the subdivision (if applicable) on all existing or proposed city streets unless determined otherwise by the city.
   (E)   Sewer grinder pump stations and force main sewer lines may be required to connect the development/subdivision to the existing city sewer system.
   (F)   Sewer pump stations intended to a serve a community subdivision area(s) within the city sewer service area shall also be furnished with backup emergency power (electrical generator) approved by the City Engineer.
(Ord. 2020-006, passed 3-9-2021) Penalty, see § 150.999