(A) (1) The developer is required to install a pressurized secondary water system to each lot in the subdivision as a condition of approval.
(2) The design of the system is to meet the city secondary water construction standard and approval of the City Engineer for current or future use.
(B) The developer shall provide water shares to the city as required by city ordinances for each lot, prior to recordation.
(Ord. 2020-006, passed 3-9-2021; Ord. 2022-003, passed 3-8-2022) Penalty, see § 150.999