50.25 WATER METER SCHEDULE.
 
T-10 ProCoder Gal. Meter
T/F Cmpd. ProCoder Gal. Meter
HP Turbine
 
5/8" x 3/4"
3/4"
1"
1 1/2"
2"
2"
3"
4"
2"
3"
4"
 
T-10 ProCoder Gal. Meter
T/F Cmpd. ProCoder Gal. Meter
HP Turbine
 
5/8" x 3/4"
3/4"
1"
1 1/2"
2"
2"
3"
4"
2"
3"
4"
Meter
105.00
165.00
240.00
420.00
600.00
1,490.0 0
2,225.0 0
2,900.0 0
610.00
1,275.0 0
1,685.00
MTU
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
Fittings
28.00
28.00
40.00
110.00
145.00
145.00
165.00
210.00
Supplied
by
contractor
Supplie d by contract or
Supplied by contract or
Wiring
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
Installation
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
Equipment
38.00
38.00
38.00
38.00
38.00
38.00
38.00
38.00
38.00
38.00
38.00
Administration
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
Total
453.10
513.10
670.10
850.10
1,065.10
1,955.10
2,710.10
3,430.10
930.10
1,595.10
2,005.10
 
(Ord. 1141, passed 2-3-2021)