(A) Skirting required. All manufactured home installations shall have a complete skirting system applied to the unit within 30 days of the manufactured home being placed on the approval site.
(B) Skirting options. All skirting material shall consist of properly treated all-weather materials which may include, but not be limited to, wood, masonry, masonry-like stone, decorative lattice or commercially available metal or plastic skirting. Any skirting or visible covering of either the insulation or foundation wall, if used, shall be consistent in color and appearance with masonry or stone, or consistent in color and appearance with the exterior siding of the manufactured home.
(C) Utility connection. Any manufactured home shall be properly connected to the necessary utilities, including sewer, water, natural gas, and electricity, within 30 days of the manufactured home or mobile home being placed on the approved site.
(Ord. 2015-07, passed 5-11-2015; Ord. 2024-01, passed 3-19-2024)