(A) Each development plan must include a detailed site plan to scale showing all of the locational aspects relevant to new development such as utility location, easement location, provision for access, and for projects over five acres or contain more than 50 dwelling units, provision for two access points for all vehicle traffic, sufficient buffering to significantly reduce the visual impact of dissimilar development, drainage control, stormwater detention and filtering, path ways, trails and/or sidewalks provided to promote a walking environment in all but industrial developments, green space provision and or landscaping, and protection of existing limestone structures.
(B) Each development plan shall incorporate improvements that conform to the standards under the subdivision ordinance and this chapter. These requirements are, except where noted, minimum requirements, and where necessary to accommodate the particular needs of the development plan under review or the particular needs of the community outside of the proposed development which will beimpacted by the development, higher standards and greater requirements shall be included as required by the Plan Commission.
(Ord. 03-05, § 811-15, passed 5-27-2003; Am. Ord. 2016-13, passed 11-14-2016)