(A) Where a new system is connected to the town's water facilities, conforms with the town's design and construction requirements, is located in a public right-of-way or dedicated public utility easement, and is accepted by the town, the petitioner shall dedicate the public components of the system to the town as public improvements after installation.
(B) As-built plans for the completed system shall be filed with the Town Water Utility Department.
(Ord. 03-27, 859-10, passed 12-22-2003)