(A) Where the system is to be connected to a public potable water system, the plans shall be certified by a professional engineer registered in Indiana.
(B) Where the system will connect to the town's or another public water distribution system:
(1) The system shall be designed in accordance with the town's design standards;
(2) The plans shall be approved by the Town Council or another utility board; and
(3) The petitioner shall obtain Indiana Department of Environmental Management construction permits.
(C) In all other cases, design and plan approval shall be by the appropriate county, state and federal agencies as required.
(Ord. 03-27, 859-05, passed 12-22-2003)