3-7-5: EXCEPTIONS:
If the building or structure to be moved is to be moved more than three (3) miles beyond the city limits; or if said building or structure to be moved was constructed pursuant to a permit issued by the building inspector's office and in conformity with all current building codes of the city within a period of sixty (60) days prior to the date specified for moving; or if said building or structure is a new building constructed or prefabricated outside the city limits which has never been occupied or used for the purpose for which it is designed and which satisfied all applicable requirements of the current building or construction codes of the city; or if said building contains under four hundred (400) square feet of floor space and has not or is not now used for human habitation, then, in any of these events, the detailed application, notices and the public hearing provided for in sections 3-7-3 and 3-7-4 of this chapter shall be dispensed with and an application for a moving permit shall be made directly to the building inspector, which shall set forth sufficient information to establish that the applicant is entitled to a permit without a public hearing. If in the opinion of the building inspector the applicant is entitled to a permit without public hearing pursuant to this section, then, upon payment of a filing fee as set by resolution of the city council, all other costs incurred by the city and the filing of the bond as required by section 3-7-8 of this chapter, the building inspector shall issue a moving permit to the applicant, subject to the terms and provisions of this chapter. (Ord. 290, 8-26-1980)